Choice Networks Ltd were appointed to install 200 x Category 6 Outlets for Inigo Business Centres Bath, the cabling was installed throughout 3 floors for separate offices back to an existing comms cabinet on the lower ground floor.
Fill in your details below and we’ll be back to you as soon as we can!